Email Us
Need Help?
Email now!

Certifications
Recently Viewed
BD244CG

BD244CG

TRANS PNP 100V 6A TO220AB

SHTSL-505-D-02-G-LL-LF

SHTSL-505-D-02-G-LL-LF

SHROUDED HEADER TERMINAL STRIP

DLS-2S

DLS-2S

2X2 MM DUO-LATERAL EFFECT POSITI

2CCPB1A1B1B

2CCPB1A1B1B

2CCP SERIES CABLE PULL SAFETY SW

2CCPB1A1B1B

2CCPB1A1B1B

Image is for reference, please contact us to get the real picture

Part No :

2CCPB1A1B1B

Manufacturer
Honeywell Sensing and Productivity Solutions
Description
2CCP SERIES CABLE PULL SAFETY SW
Catalog
Cable Pull Switches
Availability
084808 pieces
Shipped from
HK warehouse
Expected Shipping Date
May 20 - May 24 2024
Type Description
Series:2CCP
Package:Box
Part Status:Active
Circuit:4PST-2NO/2NC
Switch Function:On-Off, Off-On
Current Rating (Amps):10A (AC/DC)
Voltage Rating - AC:240V
Voltage Rating - DC:250V
Maximum Cable Length:76.2m (x2)
Features:Lighted Indicator
Operating Force:-
Ingress Protection:IP54 - Dust Protected, Water Resistant
Operating Temperature:-40°C ~ 85°C
2CCPB1A1B1B is available at GangBo-ic.com, Please review product page below for detailed information, including 2CCPB1A1B1B price, datasheets, in-stock availability, technical difficulties. Quickly Enter the access of compare list to find replaceable electronic parts. Want to gain comprehensive data for 2CCPB1A1B1B to optimize the supply chain (include cross references, lifecycle, parametric, counterfeit risk, obsolescence management forecasts), please contact to our Tech-supports team.

GANG BO INDUSTRIAL CO., LIMITED [Hongkong]

UNIT2, 22/F., RICHMOND COMM. BLDG., 109 ARGYLE STREET, MONGKOK, KOWLOON, HK

Office Hours : Mon-Fri, 9:00-18:30(GMT+8)

[email protected]

Phone: 00852-52612101

  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
  • New users will reward $5 as the credits after registration.
  • Every online shopping for $100 will receive a $5 reward.
  • Credits can be used on the second and subsequent orders.
  • The credits are valid for two years from the date your last purchase.
  • 2CCPB1A1B1B Price
  • 2CCPB1A1B1B Series
  • 2CCPB1A1B1B Datasheet
  • 2CCPB1A1B1B Application
  • 2CCPB1A1B1B Replacement
  • 2CCPB1A1B1B Pdf
  • 2CCPB1A1B1B Applications
  • 2CCPB1A1B1B Image
  • 2CCPB1A1B1B Picture
  • 2CCPB1A1B1B In Stock
  • 2CCPB1A1B1B Distributor
  • 2CCPB1A1B1B Features
Top Sellers
Sale I110-RP223

I110-RP223

SW SAFETY ROPE PULL 2NC/2NO
Sale 2CCPA2A1C2B

2CCPA2A1C2B

2CCP SERIES CABLE PULL SAFETY SW
Sale 2CCPB1A1C1A

2CCPB1A1C1A

2CCP SERIES CABLE PULL SAFETY SW
Top