Email Us
Need Help?
Email now!

Certifications
Recently Viewed
CRCW08052M67FKEAC

CRCW08052M67FKEAC

RES 2.67M OHM 1% 1/8W 0805

RLP038R250FB15MG7

RLP038R250FB15MG7

SFERNICE FIXED RESISTORS

0603J0250681FCT

0603J0250681FCT

CAP CER 680PF 25V C0G/NP0 0603

CDR33BX273BMZMAT

CDR33BX273BMZMAT

CAP CER 0.027UF 100V 20% BX 1210

RLP038R250FB15MG7

RLP038R250FB15MG7

Image is for reference, please contact us to get the real picture

Part No :

RLP038R250FB15MG7

Manufacturer
Vishay / Sfernice
Description
SFERNICE FIXED RESISTORS
Catalog
Resistors-Through Hole
Availability
760276 pieces
Shipped from
HK warehouse
Expected Shipping Date
Sep 24 - Sep 28 2025
Type Description
Series:*
Package:Bulk
Part Status:Active
Resistance:-
Tolerance:-
Power (Watts):-
Composition:-
Features:-
Temperature Coefficient:-
Operating Temperature:-
Package / Case:-
Supplier Device Package:-
Size / Dimension:-
Height - Seated (Max):-
Number of Terminations:-
Failure Rate:-
RLP038R250FB15MG7 is available at GangBo-ic.com, Please review product page below for detailed information, including RLP038R250FB15MG7 price, datasheets, in-stock availability, technical difficulties. Quickly Enter the access of compare list to find replaceable electronic parts. Want to gain comprehensive data for RLP038R250FB15MG7 to optimize the supply chain (include cross references, lifecycle, parametric, counterfeit risk, obsolescence management forecasts), please contact to our Tech-supports team.

GANG BO INDUSTRIAL CO., LIMITED [Hongkong]

UNIT2, 22/F., RICHMOND COMM. BLDG., 109 ARGYLE STREET, MONGKOK, KOWLOON, HK

Office Hours : Mon-Fri, 9:00-18:30(GMT+8)

[email protected]

Phone: 00852-52612101

  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
  • New users will reward $5 as the credits after registration.
  • Every online shopping for $100 will receive a $5 reward.
  • Credits can be used on the second and subsequent orders.
  • The credits are valid for two years from the date your last purchase.
  • RLP038R250FB15MG7 Price
  • RLP038R250FB15MG7 Series
  • RLP038R250FB15MG7 Datasheet
  • RLP038R250FB15MG7 Application
  • RLP038R250FB15MG7 Replacement
  • RLP038R250FB15MG7 Pdf
  • RLP038R250FB15MG7 Applications
  • RLP038R250FB15MG7 Image
  • RLP038R250FB15MG7 Picture
  • RLP038R250FB15MG7 In Stock
  • RLP038R250FB15MG7 Distributor
  • RLP038R250FB15MG7 Features
Top Sellers
Sale RWR84S25R5FRS73

RWR84S25R5FRS73

RES 25.5 OHM 7W 1% WW AXIAL
Sale RLR07C8452FSBSL

RLR07C8452FSBSL

RES 84.5K OHM 1% 1/4W AXIAL
Sale RLR05C7682FSRE8

RLR05C7682FSRE8

ERL-05 76.8K 1% T-1 RLR05C7682FS
Top