Email Us
Need Help?
Email now!

Certifications
Recently Viewed
C0805X7R250-334MNE

C0805X7R250-334MNE

CAP CER 0.33UF 25V X7R 0805

1210Y1000821JFR

1210Y1000821JFR

CAP CER 820PF 100V C0G/NP0 1210

ATS-03A-111-C3-R1

ATS-03A-111-C3-R1

HEATSINK 60.00MM X 60.00MM ALUM

M55342K06B75E0TWPV

M55342K06B75E0TWPV

M55342K 100PPM 0705 75K 1% T WP

M55342K06B75E0TWPV

M55342K06B75E0TWPV

Image is for reference, please contact us to get the real picture

Part No :

M55342K06B75E0TWPV

Manufacturer
Vishay / Dale
Description
M55342K 100PPM 0705 75K 1% T WP
Catalog
Chip Resistors-Surface Mount
Availability
733173 pieces
Shipped from
HK warehouse
Expected Shipping Date
Sep 26 - Sep 30 2025
Type Description
Series:*
Package:Tape & Reel (TR)
Part Status:Active
Resistance:-
Tolerance:-
Power (Watts):-
Composition:-
Features:-
Temperature Coefficient:-
Operating Temperature:-
Package / Case:-
Supplier Device Package:-
Ratings:-
Size / Dimension:-
Height - Seated (Max):-
Number of Terminations:-
Failure Rate:-
M55342K06B75E0TWPV is available at GangBo-ic.com, Please review product page below for detailed information, including M55342K06B75E0TWPV price, datasheets, in-stock availability, technical difficulties. Quickly Enter the access of compare list to find replaceable electronic parts. Want to gain comprehensive data for M55342K06B75E0TWPV to optimize the supply chain (include cross references, lifecycle, parametric, counterfeit risk, obsolescence management forecasts), please contact to our Tech-supports team.

GANG BO INDUSTRIAL CO., LIMITED [Hongkong]

UNIT2, 22/F., RICHMOND COMM. BLDG., 109 ARGYLE STREET, MONGKOK, KOWLOON, HK

Office Hours : Mon-Fri, 9:00-18:30(GMT+8)

[email protected]

Phone: 00852-52612101

  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
  • New users will reward $5 as the credits after registration.
  • Every online shopping for $100 will receive a $5 reward.
  • Credits can be used on the second and subsequent orders.
  • The credits are valid for two years from the date your last purchase.
  • M55342K06B75E0TWPV Price
  • M55342K06B75E0TWPV Series
  • M55342K06B75E0TWPV Datasheet
  • M55342K06B75E0TWPV Application
  • M55342K06B75E0TWPV Replacement
  • M55342K06B75E0TWPV Pdf
  • M55342K06B75E0TWPV Applications
  • M55342K06B75E0TWPV Image
  • M55342K06B75E0TWPV Picture
  • M55342K06B75E0TWPV In Stock
  • M55342K06B75E0TWPV Distributor
  • M55342K06B75E0TWPV Features
Top Sellers
Sale M55342E11B12B7TTI

M55342E11B12B7TTI

M55342E 25PPM 0402 12.7K 0.1% T
Sale P2010E10R0FBT

P2010E10R0FBT

SFERNICE THIN FILMS
Sale RNCF2010BKE10R5

RNCF2010BKE10R5

RES 10.5 OHM 0.1% 1/3W 2010
Top