Email Us
Need Help?
Email now!

Certifications
Recently Viewed
589S130X2IAT

589S130X2IAT

XTAL OSC VCTCXO 13.0000MHZ HCMOS

GBU4K-BP

GBU4K-BP

BRIDGE RECT 1PHASE 800V 4A GBU

M55342K03B49B9TTI

M55342K03B49B9TTI

M55342K 100PPM 1005 49.9K 0.1% T

CPL-5214-20-NNN-79

CPL-5214-20-NNN-79

RF DIR COUPLER 4GHZ-8GHZ

M55342K03B49B9TTI

M55342K03B49B9TTI

Image is for reference, please contact us to get the real picture

Part No :

M55342K03B49B9TTI

Manufacturer
Vishay / Dale
Description
M55342K 100PPM 1005 49.9K 0.1% T
Catalog
Chip Resistors-Surface Mount
Availability
947894 pieces
Shipped from
HK warehouse
Expected Shipping Date
Mar 21 - Mar 25 2025
Type Description
Series:*
Package:Tape & Reel (TR)
Part Status:Active
Resistance:-
Tolerance:-
Power (Watts):-
Composition:-
Features:-
Temperature Coefficient:-
Operating Temperature:-
Package / Case:-
Supplier Device Package:-
Ratings:-
Size / Dimension:-
Height - Seated (Max):-
Number of Terminations:-
Failure Rate:-
M55342K03B49B9TTI is available at GangBo-ic.com, Please review product page below for detailed information, including M55342K03B49B9TTI price, datasheets, in-stock availability, technical difficulties. Quickly Enter the access of compare list to find replaceable electronic parts. Want to gain comprehensive data for M55342K03B49B9TTI to optimize the supply chain (include cross references, lifecycle, parametric, counterfeit risk, obsolescence management forecasts), please contact to our Tech-supports team.

GANG BO INDUSTRIAL CO., LIMITED [Hongkong]

UNIT2, 22/F., RICHMOND COMM. BLDG., 109 ARGYLE STREET, MONGKOK, KOWLOON, HK

Office Hours : Mon-Fri, 9:00-18:30(GMT+8)

[email protected]

Phone: 00852-52612101

  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
  • New users will reward $5 as the credits after registration.
  • Every online shopping for $100 will receive a $5 reward.
  • Credits can be used on the second and subsequent orders.
  • The credits are valid for two years from the date your last purchase.
  • M55342K03B49B9TTI Price
  • M55342K03B49B9TTI Series
  • M55342K03B49B9TTI Datasheet
  • M55342K03B49B9TTI Application
  • M55342K03B49B9TTI Replacement
  • M55342K03B49B9TTI Pdf
  • M55342K03B49B9TTI Applications
  • M55342K03B49B9TTI Image
  • M55342K03B49B9TTI Picture
  • M55342K03B49B9TTI In Stock
  • M55342K03B49B9TTI Distributor
  • M55342K03B49B9TTI Features
Top Sellers
Sale P0805E4221BNTD

P0805E4221BNTD

SFERNICE THIN FILMS
Sale RN732ATTD9422A25

RN732ATTD9422A25

RES 94.2K OHM 0.05% 1/10W 0805
Sale M55342K06B12E1STIV

M55342K06B12E1STIV

M55342K 100PPM 0705 12.1K 1% S T
Top