Email Us
Need Help?
Email now!

Certifications
Recently Viewed
ALS70H242KF450

ALS70H242KF450

CAP ALUM 2400UF 20% 450V SCREW

D2TO035CR2200GTE3

D2TO035CR2200GTE3

RES SMD TO263

1302262444

1302262444

DRUM; 1000 SERIES MACHINED

0.25-5-5430

0.25-5-5430

TAPE MASKING CLEAR 1/4"X 5YDS

D2TO035CR2200GTE3

D2TO035CR2200GTE3

Image is for reference, please contact us to get the real picture

Part No :

D2TO035CR2200GTE3

Manufacturer
Vishay / Sfernice
Description
RES SMD TO263
Catalog
Chip Resistors-Surface Mount
Availability
17900 pieces
Shipped from
HK warehouse
Expected Shipping Date
Aug 12 - Aug 16 2025
Type Description
Series:*
Package:Tube
Part Status:Active
Resistance:-
Tolerance:-
Power (Watts):-
Composition:-
Features:-
Temperature Coefficient:-
Operating Temperature:-
Package / Case:-
Supplier Device Package:-
Ratings:-
Size / Dimension:-
Height - Seated (Max):-
Number of Terminations:-
Failure Rate:-
D2TO035CR2200GTE3 is available at GangBo-ic.com, Please review product page below for detailed information, including D2TO035CR2200GTE3 price, datasheets, in-stock availability, technical difficulties. Quickly Enter the access of compare list to find replaceable electronic parts. Want to gain comprehensive data for D2TO035CR2200GTE3 to optimize the supply chain (include cross references, lifecycle, parametric, counterfeit risk, obsolescence management forecasts), please contact to our Tech-supports team.

GANG BO INDUSTRIAL CO., LIMITED [Hongkong]

UNIT2, 22/F., RICHMOND COMM. BLDG., 109 ARGYLE STREET, MONGKOK, KOWLOON, HK

Office Hours : Mon-Fri, 9:00-18:30(GMT+8)

[email protected]

Phone: 00852-52612101

  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
  • New users will reward $5 as the credits after registration.
  • Every online shopping for $100 will receive a $5 reward.
  • Credits can be used on the second and subsequent orders.
  • The credits are valid for two years from the date your last purchase.
  • D2TO035CR2200GTE3 Price
  • D2TO035CR2200GTE3 Series
  • D2TO035CR2200GTE3 Datasheet
  • D2TO035CR2200GTE3 Application
  • D2TO035CR2200GTE3 Replacement
  • D2TO035CR2200GTE3 Pdf
  • D2TO035CR2200GTE3 Applications
  • D2TO035CR2200GTE3 Image
  • D2TO035CR2200GTE3 Picture
  • D2TO035CR2200GTE3 In Stock
  • D2TO035CR2200GTE3 Distributor
  • D2TO035CR2200GTE3 Features
Top Sellers
Sale M55342E12B1B54RWS

M55342E12B1B54RWS

M55342E 25PPM 0603 1.54K 0.1% R
Sale D55342E07B536ASTI

D55342E07B536ASTI

D55342E 25PPM 1206 536 0.1% S TI
Sale ERJ-S1TD2052U

ERJ-S1TD2052U

2512 ANTI-SULFUR RES. , 0.5%, 20
Top