Email Us
Need Help?
Email now!

Certifications
Recently Viewed
CX10S-G0GGGD-P-A-DK00000

CX10S-G0GGGD-P-A-DK00000

COOLX POWER SUPPLY

MS3450KT20-17SX-LC

MS3450KT20-17SX-LC

CONN RCPT HSG F 6P INLINE PNL MT

SCV-20001-LB

SCV-20001-LB

SINGLE PHASE UPS, LESS BATTERIES

1110402504

1110402504

CABLE QSFP+ M-M 5M

SCV-20001-LB

SCV-20001-LB

Image is for reference, please contact us to get the real picture

Part No :

SCV-20001-LB

Manufacturer
Staco Energy Products Co.
Description
SINGLE PHASE UPS, LESS BATTERIES
Catalog
Uninterruptible Power Supply (UPS) Systems
Availability
724472 pieces
Shipped from
HK warehouse
Expected Shipping Date
Nov 23 - Nov 27 2024
Type Description
Series:UniStar® V
Package:Bulk
Part Status:Active
Type:Online (Double Conversion)
Voltage - Input:-
Applications:General Purpose, Industrial Control
Form:Rackmount, Tower
Power - Rated:1.7kVA / 1530W
AC Outlets:8 (UPS)
Backup Time - Max Load:-
Media Lines Protected:RS-232
Voltage - Output:100V, 110V, 115V, 120V
Input Connector:NEMA 5-15P
Output Connector:NEMA 5-20R (8)
Cord Length:6' (1.83m)
Approval Agency:-
Size / Dimension:20.380" L x 17.240" W (517.65mm x 437.90mm)
Height:3.390" (86.11mm)
SCV-20001-LB is available at GangBo-ic.com, Please review product page below for detailed information, including SCV-20001-LB price, datasheets, in-stock availability, technical difficulties. Quickly Enter the access of compare list to find replaceable electronic parts. Want to gain comprehensive data for SCV-20001-LB to optimize the supply chain (include cross references, lifecycle, parametric, counterfeit risk, obsolescence management forecasts), please contact to our Tech-supports team.

GANG BO INDUSTRIAL CO., LIMITED [Hongkong]

UNIT2, 22/F., RICHMOND COMM. BLDG., 109 ARGYLE STREET, MONGKOK, KOWLOON, HK

Office Hours : Mon-Fri, 9:00-18:30(GMT+8)

[email protected]

Phone: 00852-52612101

  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
  • New users will reward $5 as the credits after registration.
  • Every online shopping for $100 will receive a $5 reward.
  • Credits can be used on the second and subsequent orders.
  • The credits are valid for two years from the date your last purchase.
  • SCV-20001-LB Price
  • SCV-20001-LB Series
  • SCV-20001-LB Datasheet
  • SCV-20001-LB Application
  • SCV-20001-LB Replacement
  • SCV-20001-LB Pdf
  • SCV-20001-LB Applications
  • SCV-20001-LB Image
  • SCV-20001-LB Picture
  • SCV-20001-LB In Stock
  • SCV-20001-LB Distributor
  • SCV-20001-LB Features
Top Sellers
Sale SUINT1000LCD2UN

SUINT1000LCD2UN

208/230V 1000VA 900W DOUBLE-CONV
Sale SVX120KL

SVX120KL

SMARTONLINE SVX SERIES 120KVA MO
Sale SMART1000RM2UN

SMART1000RM2UN

SMARTPRO 120V 1000VA 800W LINE-I
Top