Email Us
Need Help?
Email now!

Certifications
Recently Viewed
KPSE02E16-8SWA71

KPSE02E16-8SWA71

CONN RCPT FMALE 8POS GOLD CRIMP

PDU3EVSR6L1530

PDU3EVSR6L1530

3-PHASE PDU SWITCHED 10KW 200/20

VE-B04-IX-B1

VE-B04-IX-B1

DC DC CONVERTER 48V 75W

PDU3EVSR6L1530

PDU3EVSR6L1530

Image is for reference, please contact us to get the real picture

Part No :

PDU3EVSR6L1530

Manufacturer
Tripp Lite
Description
3-PHASE PDU SWITCHED 10KW 200/20
Catalog
Power Distribution, Surge Protectors
Availability
136613 pieces
Shipped from
HK warehouse
Expected Shipping Date
Nov 26 - Nov 30 2024
Type Description
Series:-
Package:Bulk
Part Status:Active
Type:PDU (Power Distribution Unit)
Mounting Type:Rack, Vertical
Current - Max:24A
Region Utilized:North America
Overload Protection:Circuit Breaker(s)
Connector - AC Input:NEMA L15-30P
Connector - AC Output:IEC 320-C13 (24), C19 (6)
Voltage - Input:208V, 240V
Housing Material:Metal
Media Lines Protected:-
AC Outlets:30
Energy:-
Cord Length:6' (1.83m)
Approval Agency:CSA, NOM, UL
Features:Ethernet Control and Monitor Interface for Individual Outlets, Programmable Alerts, Load Meter
PDU3EVSR6L1530 is available at GangBo-ic.com, Please review product page below for detailed information, including PDU3EVSR6L1530 price, datasheets, in-stock availability, technical difficulties. Quickly Enter the access of compare list to find replaceable electronic parts. Want to gain comprehensive data for PDU3EVSR6L1530 to optimize the supply chain (include cross references, lifecycle, parametric, counterfeit risk, obsolescence management forecasts), please contact to our Tech-supports team.

GANG BO INDUSTRIAL CO., LIMITED [Hongkong]

UNIT2, 22/F., RICHMOND COMM. BLDG., 109 ARGYLE STREET, MONGKOK, KOWLOON, HK

Office Hours : Mon-Fri, 9:00-18:30(GMT+8)

[email protected]

Phone: 00852-52612101

  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
  • New users will reward $5 as the credits after registration.
  • Every online shopping for $100 will receive a $5 reward.
  • Credits can be used on the second and subsequent orders.
  • The credits are valid for two years from the date your last purchase.
  • PDU3EVSR6L1530 Price
  • PDU3EVSR6L1530 Series
  • PDU3EVSR6L1530 Datasheet
  • PDU3EVSR6L1530 Application
  • PDU3EVSR6L1530 Replacement
  • PDU3EVSR6L1530 Pdf
  • PDU3EVSR6L1530 Applications
  • PDU3EVSR6L1530 Image
  • PDU3EVSR6L1530 Picture
  • PDU3EVSR6L1530 In Stock
  • PDU3EVSR6L1530 Distributor
  • PDU3EVSR6L1530 Features
Top Sellers
Sale TLP1F

TLP1F

1-OUTLET SURGE PROTECTOR - FRENC
Sale P24G03M-BU2A

P24G03M-BU2A

PDU VERT C13 C19 MONITOR & SWTCH
Sale P24G03M-YL1C

P24G03M-YL1C

PDU VERT C13 C19 MONITOR & SWTCH
Top