Email Us
Need Help?
Email now!

Certifications
Recently Viewed
ABMSL-USB3-5FT

ABMSL-USB3-5FT

5FT. USB 3 SUPERSPEED A MALE TO

MC9328MXLCVP15

MC9328MXLCVP15

DRAGONBALL MXL 225 PB-FR

MC9328MXLCVP15

MC9328MXLCVP15

Image is for reference, please contact us to get the real picture

Part No :

MC9328MXLCVP15

Manufacturer
Rochester Electronics
Description
DRAGONBALL MXL 225 PB-FR
Catalog
Embedded - Microprocessors
Availability
804280 pieces
Shipped from
HK warehouse
Expected Shipping Date
Nov 25 - Nov 29 2024
PDF
MC9328MXLCVP15 PDF
Type Description
Series:i.MXL
Package:Tray
Part Status:Obsolete
Core Processor:ARM920T
Number of Cores/Bus Width:1 Core, 32-Bit
Speed:150MHz
Co-Processors/DSP:-
RAM Controllers:SDRAM
Graphics Acceleration:No
Display & Interface Controllers:LCD
Ethernet:-
SATA:-
USB:USB 1.x (1)
Voltage - I/O:1.8V, 3.0V
Operating Temperature:-40°C ~ 85°C (TA)
Security Features:-
Package / Case:225-LFBGA
Supplier Device Package:225-MAPBGA (13x13)
MC9328MXLCVP15 is available at GangBo-ic.com, Please review product page below for detailed information, including MC9328MXLCVP15 price, datasheets, in-stock availability, technical difficulties. Quickly Enter the access of compare list to find replaceable electronic parts. Want to gain comprehensive data for MC9328MXLCVP15 to optimize the supply chain (include cross references, lifecycle, parametric, counterfeit risk, obsolescence management forecasts), please contact to our Tech-supports team.

GANG BO INDUSTRIAL CO., LIMITED [Hongkong]

UNIT2, 22/F., RICHMOND COMM. BLDG., 109 ARGYLE STREET, MONGKOK, KOWLOON, HK

Office Hours : Mon-Fri, 9:00-18:30(GMT+8)

[email protected]

Phone: 00852-52612101

  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
  • New users will reward $5 as the credits after registration.
  • Every online shopping for $100 will receive a $5 reward.
  • Credits can be used on the second and subsequent orders.
  • The credits are valid for two years from the date your last purchase.
  • MC9328MXLCVP15 Price
  • MC9328MXLCVP15 Series
  • MC9328MXLCVP15 Datasheet
  • MC9328MXLCVP15 Application
  • MC9328MXLCVP15 Replacement
  • MC9328MXLCVP15 Pdf
  • MC9328MXLCVP15 Applications
  • MC9328MXLCVP15 Image
  • MC9328MXLCVP15 Picture
  • MC9328MXLCVP15 In Stock
  • MC9328MXLCVP15 Distributor
  • MC9328MXLCVP15 Features
Top Sellers
Sale 25PPC750CX-DP0323T

25PPC750CX-DP0323T

IBM25PPC750 - POWERPC 750CX
Sale AM4376BZDN80

AM4376BZDN80

MOD ARM CORTEX-A9 491NFBGA
Sale MCIMX6S5EVM10ACR

MCIMX6S5EVM10ACR

IC MPU I.MX6S 1.0GHZ 624MAPBGA
Top