Email Us
Need Help?
Email now!

Certifications
Recently Viewed
S2010DRP

S2010DRP

SCR 200V 10A TO252

S2010DRP

S2010DRP

Image is for reference, please contact us to get the real picture

Part No :

S2010DRP

Manufacturer
Wickmann / Littelfuse
Description
SCR 200V 10A TO252
Catalog
Thyristors - SCRs
Availability
778977 pieces
Shipped from
HK warehouse
Expected Shipping Date
Nov 25 - Nov 29 2024
PDF
S2010DRP PDF
Type Description
Series:-
Package:Tape & Reel (TR)
Part Status:Obsolete
Voltage - Off State:200 V
Voltage - Gate Trigger (Vgt) (Max):1.5 V
Current - Gate Trigger (Igt) (Max):15 mA
Voltage - On State (Vtm) (Max):1.6 V
Current - On State (It (AV)) (Max):6.4 A
Current - On State (It (RMS)) (Max):10 A
Current - Hold (Ih) (Max):30 mA
Current - Off State (Max):10 µA
Current - Non Rep. Surge 50, 60Hz (Itsm):83A, 100A
SCR Type:Standard Recovery
Operating Temperature:-40°C ~ 125°C
Mounting Type:Surface Mount
Package / Case:TO-252-3, DPak (2 Leads + Tab), SC-63
Supplier Device Package:TO-252, (D-Pak)
S2010DRP is available at GangBo-ic.com, Please review product page below for detailed information, including S2010DRP price, datasheets, in-stock availability, technical difficulties. Quickly Enter the access of compare list to find replaceable electronic parts. Want to gain comprehensive data for S2010DRP to optimize the supply chain (include cross references, lifecycle, parametric, counterfeit risk, obsolescence management forecasts), please contact to our Tech-supports team.

GANG BO INDUSTRIAL CO., LIMITED [Hongkong]

UNIT2, 22/F., RICHMOND COMM. BLDG., 109 ARGYLE STREET, MONGKOK, KOWLOON, HK

Office Hours : Mon-Fri, 9:00-18:30(GMT+8)

[email protected]

Phone: 00852-52612101

  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
  • New users will reward $5 as the credits after registration.
  • Every online shopping for $100 will receive a $5 reward.
  • Credits can be used on the second and subsequent orders.
  • The credits are valid for two years from the date your last purchase.
  • S2010DRP Price
  • S2010DRP Series
  • S2010DRP Datasheet
  • S2010DRP Application
  • S2010DRP Replacement
  • S2010DRP Pdf
  • S2010DRP Applications
  • S2010DRP Image
  • S2010DRP Picture
  • S2010DRP In Stock
  • S2010DRP Distributor
  • S2010DRP Features
Top Sellers
Sale S2008DS2RP

S2008DS2RP

SCR 200V 8A TO252
Sale S8055R67RP

S8055R67RP

SCR 800V 55A TO220
Sale 25TTS08FP

25TTS08FP

SCR 800V 25A TO220AB FP
Top