Email Us
Need Help?
Email now!

Certifications
Recently Viewed
DSEP40-03AS-TUB

DSEP40-03AS-TUB

POWER DIODE DISCRETES-FRED TO-26

DSEP40-03AS-TUB

DSEP40-03AS-TUB

Image is for reference, please contact us to get the real picture

Part No :

DSEP40-03AS-TUB

Manufacturer
Wickmann / Littelfuse
Description
POWER DIODE DISCRETES-FRED TO-26
Catalog
Diodes - Rectifiers - Single
Availability
605660 pieces
Shipped from
HK warehouse
Expected Shipping Date
Nov 23 - Nov 27 2024
Type Description
Series:-
Package:Tube
Part Status:Active
Diode Type:Standard
Voltage - DC Reverse (Vr) (Max):300 V
Current - Average Rectified (Io):40A
Voltage - Forward (Vf) (Max) @ If:1.46 V @ 40 A
Speed:Fast Recovery =< 500ns, > 200mA (Io)
Reverse Recovery Time (trr):35 ns
Current - Reverse Leakage @ Vr:5 µA @ 300 V
Capacitance @ Vr, F:50pF @ 150V, 1MHz
Mounting Type:Surface Mount
Package / Case:TO-263-3, D²Pak (2 Leads + Tab), TO-263AB
Supplier Device Package:TO-263 (D2Pak)
Operating Temperature - Junction:-55°C ~ 175°C
DSEP40-03AS-TUB is available at GangBo-ic.com, Please review product page below for detailed information, including DSEP40-03AS-TUB price, datasheets, in-stock availability, technical difficulties. Quickly Enter the access of compare list to find replaceable electronic parts. Want to gain comprehensive data for DSEP40-03AS-TUB to optimize the supply chain (include cross references, lifecycle, parametric, counterfeit risk, obsolescence management forecasts), please contact to our Tech-supports team.

GANG BO INDUSTRIAL CO., LIMITED [Hongkong]

UNIT2, 22/F., RICHMOND COMM. BLDG., 109 ARGYLE STREET, MONGKOK, KOWLOON, HK

Office Hours : Mon-Fri, 9:00-18:30(GMT+8)

[email protected]

Phone: 00852-52612101

  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
  • New users will reward $5 as the credits after registration.
  • Every online shopping for $100 will receive a $5 reward.
  • Credits can be used on the second and subsequent orders.
  • The credits are valid for two years from the date your last purchase.
  • DSEP40-03AS-TUB Price
  • DSEP40-03AS-TUB Series
  • DSEP40-03AS-TUB Datasheet
  • DSEP40-03AS-TUB Application
  • DSEP40-03AS-TUB Replacement
  • DSEP40-03AS-TUB Pdf
  • DSEP40-03AS-TUB Applications
  • DSEP40-03AS-TUB Image
  • DSEP40-03AS-TUB Picture
  • DSEP40-03AS-TUB In Stock
  • DSEP40-03AS-TUB Distributor
  • DSEP40-03AS-TUB Features
Top Sellers
Sale VS-4ESH02-M3/86A

VS-4ESH02-M3/86A

DIODE GEN PURP 200V 4A TO277A
Sale P1000J

P1000J

DIODE STD D8X7.5 600V 10A
Sale SS26-M3/5BT

SS26-M3/5BT

DIODE SCHOTTKY 2A 60V DO-214AA
Top