Email Us
Need Help?
Email now!

Certifications
Recently Viewed
BAV21,113

BAV21,113

DIODE GEN PURP 200V 250MA ALF2

BAV21,113

BAV21,113

Image is for reference, please contact us to get the real picture

Part No :

BAV21,113

Manufacturer
Nexperia
Description
DIODE GEN PURP 200V 250MA ALF2
Catalog
Diodes - Rectifiers - Single
Availability
23279 pieces
Shipped from
HK warehouse
Expected Shipping Date
Dec 26 - Dec 30 2024
PDF
BAV21,113 PDF
Type Description
Series:-
Package:Tape & Reel (TR)Cut Tape (CT)
Part Status:Active
Diode Type:Standard
Voltage - DC Reverse (Vr) (Max):200 V
Current - Average Rectified (Io):250mA (DC)
Voltage - Forward (Vf) (Max) @ If:1.25 V @ 200 mA
Speed:Fast Recovery =< 500ns, > 200mA (Io)
Reverse Recovery Time (trr):50 ns
Current - Reverse Leakage @ Vr:100 nA @ 200 V
Capacitance @ Vr, F:5pF @ 0V, 1MHz
Mounting Type:Through Hole
Package / Case:DO-204AH, DO-35, Axial
Supplier Device Package:ALF2
Operating Temperature - Junction:175°C (Max)
BAV21,113 is available at GangBo-ic.com, Please review product page below for detailed information, including BAV21,113 price, datasheets, in-stock availability, technical difficulties. Quickly Enter the access of compare list to find replaceable electronic parts. Want to gain comprehensive data for BAV21,113 to optimize the supply chain (include cross references, lifecycle, parametric, counterfeit risk, obsolescence management forecasts), please contact to our Tech-supports team.

GANG BO INDUSTRIAL CO., LIMITED [Hongkong]

UNIT2, 22/F., RICHMOND COMM. BLDG., 109 ARGYLE STREET, MONGKOK, KOWLOON, HK

Office Hours : Mon-Fri, 9:00-18:30(GMT+8)

[email protected]

Phone: 00852-52612101

  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
  • New users will reward $5 as the credits after registration.
  • Every online shopping for $100 will receive a $5 reward.
  • Credits can be used on the second and subsequent orders.
  • The credits are valid for two years from the date your last purchase.
  • BAV21,113 Price
  • BAV21,113 Series
  • BAV21,113 Datasheet
  • BAV21,113 Application
  • BAV21,113 Replacement
  • BAV21,113 Pdf
  • BAV21,113 Applications
  • BAV21,113 Image
  • BAV21,113 Picture
  • BAV21,113 In Stock
  • BAV21,113 Distributor
  • BAV21,113 Features
Top Sellers
Sale DFLR1400-7

DFLR1400-7

DIODE GP 400V 1A POWERDI123
Sale VS-305U160

VS-305U160

DIODE GP 1.6KV 330A DO205AB
Sale DHG30I600PA

DHG30I600PA

DIODE GEN PURP 600V 30A TO220AC
Top