Email Us
Need Help?
Email now!

Certifications
Recently Viewed
RLR05C68R0FRRE6

RLR05C68R0FRRE6

ERL-05 68 1% T-1 RLR05C68R0FR RE

CBB150

CBB150

POWER TERM BLOCK RING LUG 285A 8

CBB150

CBB150

Image is for reference, please contact us to get the real picture

Part No :

CBB150

Manufacturer
Altech Corporation
Description
POWER TERM BLOCK RING LUG 285A 8
Catalog
Terminal Blocks - Specialized
Availability
400640 pieces
Shipped from
HK warehouse
Expected Shipping Date
Nov 26 - Nov 30 2024
Type Description
Series:CBB
Package:Bulk
Part Status:Active
Type:Bus Bar - Terminals
Mounting Type:DIN Rail
Number of Positions:2
Number of Levels:1
Terminal - Width:48.0mm
Termination Style:Bolt and Nut
Current - IEC:309 A
Voltage - IEC:1 kV
Current - UL:285 A
Voltage - UL:600 V
Wire Gauge or Range - AWG:300kcmil-8 AWG
Wire Gauge or Range - mm²:16-150mm²
Features:-
Housing Color:Gray
CBB150 is available at GangBo-ic.com, Please review product page below for detailed information, including CBB150 price, datasheets, in-stock availability, technical difficulties. Quickly Enter the access of compare list to find replaceable electronic parts. Want to gain comprehensive data for CBB150 to optimize the supply chain (include cross references, lifecycle, parametric, counterfeit risk, obsolescence management forecasts), please contact to our Tech-supports team.

GANG BO INDUSTRIAL CO., LIMITED [Hongkong]

UNIT2, 22/F., RICHMOND COMM. BLDG., 109 ARGYLE STREET, MONGKOK, KOWLOON, HK

Office Hours : Mon-Fri, 9:00-18:30(GMT+8)

[email protected]

Phone: 00852-52612101

  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
  • New users will reward $5 as the credits after registration.
  • Every online shopping for $100 will receive a $5 reward.
  • Credits can be used on the second and subsequent orders.
  • The credits are valid for two years from the date your last purchase.
  • CBB150 Price
  • CBB150 Series
  • CBB150 Datasheet
  • CBB150 Application
  • CBB150 Replacement
  • CBB150 Pdf
  • CBB150 Applications
  • CBB150 Image
  • CBB150 Picture
  • CBB150 In Stock
  • CBB150 Distributor
  • CBB150 Features
Top Sellers
Sale 3654.3

3654.3

FEED-THROUGH TERMINAL
Sale 3588.5

3588.5

FEED-THROUGH TERMINAL FOR DIRECT
Sale 2351.2

2351.2

FEED-THROUGH TERMINAL FOR DIRECT
Top