Email Us
Need Help?
Email now!

Certifications
Recently Viewed
LE-MG-12W

LE-MG-12W

LED MIDGET GROOVE T1 3/4

8D513F26BA

8D513F26BA

8D 26C 6#22D 2#12 SKT PLUG

10119312-2060LF

10119312-2060LF

MIN-SAS HD ASY

8D513F26BA

8D513F26BA

Image is for reference, please contact us to get the real picture

Part No :

8D513F26BA

Manufacturer
Souriau-Sunbank by Eaton
Description
8D 26C 6#22D 2#12 SKT PLUG
Catalog
Circular Connectors
Availability
916191 pieces
Shipped from
HK warehouse
Expected Shipping Date
Nov 28 - Dec 02 2024
PDF
8D513F26BA PDF
Type Description
Series:*
Package:Bulk
Part Status:Active
Connector Type:-
Number of Positions:-
Shell Size - Insert:-
Shell Size, MIL:-
Mounting Type:-
Mounting Feature:-
Termination:-
Fastening Type:-
Orientation:-
Shell Material:-
Shell Finish:-
Contact Finish - Mating:-
Color:-
Ingress Protection:-
Material Flammability Rating:-
Features:-
Shielding:-
Current Rating (Amps):-
Voltage Rating:-
Cable Opening:-
Operating Temperature:-
8D513F26BA is available at GangBo-ic.com, Please review product page below for detailed information, including 8D513F26BA price, datasheets, in-stock availability, technical difficulties. Quickly Enter the access of compare list to find replaceable electronic parts. Want to gain comprehensive data for 8D513F26BA to optimize the supply chain (include cross references, lifecycle, parametric, counterfeit risk, obsolescence management forecasts), please contact to our Tech-supports team.

GANG BO INDUSTRIAL CO., LIMITED [Hongkong]

UNIT2, 22/F., RICHMOND COMM. BLDG., 109 ARGYLE STREET, MONGKOK, KOWLOON, HK

Office Hours : Mon-Fri, 9:00-18:30(GMT+8)

[email protected]

Phone: 00852-52612101

  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
  • New users will reward $5 as the credits after registration.
  • Every online shopping for $100 will receive a $5 reward.
  • Credits can be used on the second and subsequent orders.
  • The credits are valid for two years from the date your last purchase.
  • 8D513F26BA Price
  • 8D513F26BA Series
  • 8D513F26BA Datasheet
  • 8D513F26BA Application
  • 8D513F26BA Replacement
  • 8D513F26BA Pdf
  • 8D513F26BA Applications
  • 8D513F26BA Image
  • 8D513F26BA Picture
  • 8D513F26BA In Stock
  • 8D513F26BA Distributor
  • 8D513F26BA Features
Top Sellers
Sale DTS20W15-15JN [V001]

DTS20W15-15JN [V001]

RECP ASSY
Sale YAFD58-24-61PXC019

YAFD58-24-61PXC019

MS3472A24-61PX
Sale LJT00RT-17-35P-023

LJT00RT-17-35P-023

CONN RCPT MALE 55POS GOLD CRIMP
Top