Email Us
Need Help?
Email now!

Certifications
Recently Viewed
2003.2

2003.2

CONN TERM BLK SEPARATOR RAIL BG

2003.2

2003.2

Image is for reference, please contact us to get the real picture

Part No :

2003.2

Manufacturer
On-Shore Technology, Inc.
Description
CONN TERM BLK SEPARATOR RAIL BG
Catalog
Terminal Blocks - Accessories
Availability
852785 pieces
Shipped from
HK warehouse
Expected Shipping Date
May 01 - May 05 2024
PDF
2003.2 PDF
Type Description
Series:-
Package:Bulk
Part Status:Active
Type:Separator, Rail Type
Number of Positions:-
For Use With/Related Products:Multiple
Color:Beige
2003.2 is available at GangBo-ic.com, Please review product page below for detailed information, including 2003.2 price, datasheets, in-stock availability, technical difficulties. Quickly Enter the access of compare list to find replaceable electronic parts. Want to gain comprehensive data for 2003.2 to optimize the supply chain (include cross references, lifecycle, parametric, counterfeit risk, obsolescence management forecasts), please contact to our Tech-supports team.

GANG BO INDUSTRIAL CO., LIMITED [Hongkong]

UNIT2, 22/F., RICHMOND COMM. BLDG., 109 ARGYLE STREET, MONGKOK, KOWLOON, HK

Office Hours : Mon-Fri, 9:00-18:30(GMT+8)

[email protected]

Phone: 00852-52612101

  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
  • New users will reward $5 as the credits after registration.
  • Every online shopping for $100 will receive a $5 reward.
  • Credits can be used on the second and subsequent orders.
  • The credits are valid for two years from the date your last purchase.
  • 2003.2 Price
  • 2003.2 Series
  • 2003.2 Datasheet
  • 2003.2 Application
  • 2003.2 Replacement
  • 2003.2 Pdf
  • 2003.2 Applications
  • 2003.2 Image
  • 2003.2 Picture
  • 2003.2 In Stock
  • 2003.2 Distributor
  • 2003.2 Features
Top Sellers
Sale 1783550000

1783550000

CONN TERM BLK END PLATE RAIL BG
Sale 1201594

1201594

CONN TERM BLK MNT RAIL SUP
Sale LPBC53

LPBC53

CONN TERM BLK COVER CLEAR 3POS
Top