Email Us
Need Help?
Email now!

Certifications
Recently Viewed
9B-12.288MBBK-B

9B-12.288MBBK-B

CRYSTAL 12.2880MHZ 20PF TH

SG-8018CG 29.4920M-TJHSA0

SG-8018CG 29.4920M-TJHSA0

XTAL OSC XO 29.4920MHZ CMOS SMD

TPH6R003NL,LQ

TPH6R003NL,LQ

MOSFET N CH 30V 38A 8SOP

MAL219691262E3

MAL219691262E3

CAP 15F -20% +80% 2.8V SNAP

MAL219691262E3

MAL219691262E3

Image is for reference, please contact us to get the real picture

Part No :

MAL219691262E3

Manufacturer
Vishay BC Components/Beyshlag/Draloric
Description
CAP 15F -20% +80% 2.8V SNAP
Catalog
Electric Double Layer Capacitors (EDLC), Supercapacitors
Availability
168116 pieces
Shipped from
HK warehouse
Expected Shipping Date
Nov 26 - Nov 30 2024
PDF
MAL219691262E3 PDF
Type Description
Series:ENYCAP™ 196HVC
Package:Tray
Part Status:Active
Capacitance:15 F
Tolerance:-20%, +80%
Voltage - Rated:2.8 V
ESR (Equivalent Series Resistance):1.2Ohm @ 1kHz
Lifetime @ Temp.:1000 Hrs @ 85°C
Termination:SMD (SMT) Tabs
Mounting Type:User Defined
Package / Case:Coin
Lead Spacing:-
Size / Dimension:0.945" L x 0.571" W (24.00mm x 14.50mm)
Height - Seated (Max):0.138" (3.50mm)
Operating Temperature:-20°C ~ 85°C
MAL219691262E3 is available at GangBo-ic.com, Please review product page below for detailed information, including MAL219691262E3 price, datasheets, in-stock availability, technical difficulties. Quickly Enter the access of compare list to find replaceable electronic parts. Want to gain comprehensive data for MAL219691262E3 to optimize the supply chain (include cross references, lifecycle, parametric, counterfeit risk, obsolescence management forecasts), please contact to our Tech-supports team.

GANG BO INDUSTRIAL CO., LIMITED [Hongkong]

UNIT2, 22/F., RICHMOND COMM. BLDG., 109 ARGYLE STREET, MONGKOK, KOWLOON, HK

Office Hours : Mon-Fri, 9:00-18:30(GMT+8)

[email protected]

Phone: 00852-52612101

  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
  • New users will reward $5 as the credits after registration.
  • Every online shopping for $100 will receive a $5 reward.
  • Credits can be used on the second and subsequent orders.
  • The credits are valid for two years from the date your last purchase.
  • MAL219691262E3 Price
  • MAL219691262E3 Series
  • MAL219691262E3 Datasheet
  • MAL219691262E3 Application
  • MAL219691262E3 Replacement
  • MAL219691262E3 Pdf
  • MAL219691262E3 Applications
  • MAL219691262E3 Image
  • MAL219691262E3 Picture
  • MAL219691262E3 In Stock
  • MAL219691262E3 Distributor
  • MAL219691262E3 Features
Top Sellers
Sale MAL219691126E3

MAL219691126E3

CAP 4F -20% +80% 8.4V T/H
Sale BWC465823ZNB

BWC465823ZNB

SUPERCAPS
Sale BZ05FB6828NBCL

BZ05FB6828NBCL

BESTCAP
Top